In the Fall of 2016, additional maintenance was completed, including filling and resurfacing joints of both abutments of the southern/secondary spillway and resurfacing of crest of the secondary spillway. This was completed in a low water period where no water diversion was required. A small coffer dam was required to repair the deteriorating southern abutment and crest of the primary spillway. The fence spanning the primary spillway was also replaced.